Salt Loading Pier Evaluation

Since 1987, CTLGroup has performed seasonal condition assessments of a salt loading pier located on the island of Bonaire in the Lesser Antilles. The pier, which had been exposed to more than 30 years of severe chloride exposure from the salt product itself and harsh chloride-laden Caribbean sea spray, exhibited significant chlorideinduced reinforcement corrosion damage in many areas.

CTLGroup’s engineering team mobilized to the site, evaluated conditions using field and laboratory techniques, and designed repairs to restore both the structural integrity and extend the service life of the pier. Repairs were implemented, allowing the pier to still remain in service after more than 25 years.

Markets

Civil Infrastructure

Consulting Services

Materials Science + Engineering

Structural Engineering + Evaluation

Corrosion Science

Durability & Service Life

Non-Destructive Evaluation

Repair, Restoration, Retrofit

Structural Condition Assessment

Laboratory Services

Concrete + Cement-Based Materials

Durability & Service Life Testing

The salt fount on Bonaire is famous for their long, dense and heavy crystals. Since the crystals are so large, they can be transformed into several different grades to be used in multiple ways, such as dyes for the textile industry, home water softeners, and processing in the petroleum industry.

365

Hours Worked

55

Farthest Depth (Feet)

86

Average Temperature Year-Round

Learn more about this project

The loading pier on the island of Bonaire in the Lesser Antilles, has been exposed to more than 30 years of severe chloride exposure from the salt product itself and harsh chloride-laden Caribbean sea spray. Since 1987 CTLGroup has performed seasonal condition assessments…